Cane Creek

Vintage Newark Diode Transistor Semiconductor Long Leads LOT of 5 IR pn# 1N936

Description: Vintage Newark Diode Transistor Semiconductor Long Leads LOT of 5 IR pn# 1N936 There are lots of goodies in this - well 5 of them.. THese are Newark Please ask questions. We got these from govt. overstock auction. These are mint new condition. OEM NOS FREE USA Shipping.

Price: 39.99 USD

Location: Minneapolis, Minnesota

End Time: 2024-01-08T17:21:31.000Z

Shipping Cost: 0 USD

Product Images

Vintage Newark Diode Transistor Semiconductor Long Leads LOT of 5  IR pn# 1N936 Vintage Newark Diode Transistor Semiconductor Long Leads LOT of 5  IR pn# 1N936

Item Specifics

Return shipping will be paid by: Buyer

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Return policy details:

Brand: general electric

Model: Denver

MPN: IR Style

Recommended

General Electric 9T51B107 Power Transformer 120/240V 60Hz 1 Phase Type QB
General Electric 9T51B107 Power Transformer 120/240V 60Hz 1 Phase Type QB

$20.00

View Details
General Electric GE RS232 Ivory Remote Control Switch 3A 24V
General Electric GE RS232 Ivory Remote Control Switch 3A 24V

$49.95

View Details
General Electric THQP240 2 Pole 40 Amp 120/240VAC Breaker
General Electric THQP240 2 Pole 40 Amp 120/240VAC Breaker

$10.19

View Details
General Electric TEY370 3 pole 70 Amp 480 volt TESTED
General Electric TEY370 3 pole 70 Amp 480 volt TESTED

$184.40

View Details
General Electric DR4-RTFB-VLA GE LED Signal Light DR4RTFBVLA 6"
General Electric DR4-RTFB-VLA GE LED Signal Light DR4RTFBVLA 6"

$83.77

View Details
ONE 882 General Electric Light  ""please read the listing""
ONE 882 General Electric Light ""please read the listing""

$15.00

View Details
GENERAL ELECTRIC (GE) ACLARA, WATTHOUR METER KWH, MODEL I-210, 240V, 200A, FM2S
GENERAL ELECTRIC (GE) ACLARA, WATTHOUR METER KWH, MODEL I-210, 240V, 200A, FM2S

$28.50

View Details
GE 8000 General Electric 204B4050VS  12" Operating Handle Mechanism
GE 8000 General Electric 204B4050VS 12" Operating Handle Mechanism

$75.00

View Details
NOS 2x Genuine General Electric GE C-100 C-200 EA97X249 RS3825 Needle Stylus
NOS 2x Genuine General Electric GE C-100 C-200 EA97X249 RS3825 Needle Stylus

$19.99

View Details
Dryer Main Knob for General Electric, AP6032623, PS11763058, WE03X25285
Dryer Main Knob for General Electric, AP6032623, PS11763058, WE03X25285

$13.21

View Details