Description: Project Management with Dynamic Scheduling: Baseline Scheduling, Risk Analysis and Project Control, 2nd Edition, Hardcover BRAND NEWShipped with USPS Media Mail. Authors Mario VanhouckePublisher SpringerEdition Number 2nd EditionPublication Date 2013Copyright Date 2013Format HardcoverNumber of Pages 318+ pagesIllustrated YesLanguage EnglishAudience Scholarly & Professional [Can consist of undergraduate or MBA students following a project management course, participants of company trainings with a focus on scheduling or software users who search for added value when using software tools] ISBN-13: 9783642404375 ISBN-10: 3642404375 The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle. Consequently, a project schedule should especially be considered as nothing more than a predictive model that can be used for resource efficiency calculations, time and cost risk analyses, project tracking and performance measurement, and so on. In this book, the three dimensions of dynamic scheduling are highlighted in detail and are based on and inspired by a combination of academic research studies at Ghent University (www.ugent.be), in-company trainings at Vlerick Business School (www.vlerick.com) and consultancy projects at OR-AS (www.or-as.be). First, the construction of a project baseline schedule is a central theme throughout the various chapters of the book, and is discussed from a complexity point of view with and without the presence of project resources. Second, the creation of an awareness of the weak parts in a baseline schedule is discussed at the end of the two baseline scheduling parts as schedule risk analysis techniques that can be applied on top of the baseline schedule. Third, the baseline schedule and its risk analyses can be used as guidelines during the project control step where actual deviations can be corrected within the margins of the project's time and cost reserves. The second edition of this book has seen corrections, additions and amendments in detail throughout the book. Moreover Chapter 15 on "Dynamic Scheduling with ProTrack" has been completely rewritten and extended with a section on "ProTrack as a research tool".
Price: 75 USD
Location: Johns Island, South Carolina
End Time: 2025-01-02T05:39:45.000Z
Shipping Cost: 0 USD
Product Images
Item Specifics
All returns accepted: ReturnsNotAccepted
Narrative Type: Nonfiction
Topic: Project Management
Special Attributes: 2nd Edition
Genre: Management
Item Length: 9.3in
Item Height: 0.3in
Item Width: 6.1in
Author: Mario Vanhoucke
Publication Name: Project Management with Dynamic Scheduling : Baseline Scheduling, Risk Analysis and Project Control
Format: Hardcover
Language: English
Publisher: Springer Berlin / Heidelberg
Publication Year: 2013
Type: Textbook
Item Weight: 221.1 Oz
Number of Pages: Xviii, 318 Pages