Cane Creek

10 NOS Piher 1k ohm 5% 1/2 watt 1/2W Carbon Film Resistors Long Leads TEST 1000

Description: Up for sale here is this set of 10 NOS Piher 1k ohm 5% 1/2-watt carbon film resistors, Made in Spain in the 1970s. These are new old stock--brand new, never used. These test very close to their marked rating. Please see my pictures for details and sample test results. US shipping and handling is $5, and international is $18, no matter what quantity you buy. All my small parts are set up for combined shipping, so just use the "add to cart" feature and then check out all at once, and it will combine shipping. If you have any questions, please ask. I have more resistors and other vintage electronics listed--feel free to take a look!

Price: 15 USD

Location: Milwaukee, Wisconsin

End Time: 2024-01-12T16:32:04.000Z

Shipping Cost: 5 USD

Product Images

10 NOS Piher 1k ohm 5% 1/2 watt 1/2W Carbon Film Resistors Long Leads TEST 100010 NOS Piher 1k ohm 5% 1/2 watt 1/2W Carbon Film Resistors Long Leads TEST 100010 NOS Piher 1k ohm 5% 1/2 watt 1/2W Carbon Film Resistors Long Leads TEST 1000

Item Specifics

Restocking Fee: No

Return shipping will be paid by: Buyer

All returns accepted: Returns Accepted

Item must be returned within: 30 Days

Refund will be given as: Money Back

Return policy details:

Type: Resistor

MPN: 1k

Brand: Piher

Recommended

(5x) 5K - 200K Ohm - 1/4W Trim Pots - Horizontal Adjust - Piher PT15XH06
(5x) 5K - 200K Ohm - 1/4W Trim Pots - Horizontal Adjust - Piher PT15XH06

$3.97

View Details
qty10 Piher PT10LH2.5-47K Carbon Trimmer Potentiometer 10mm Horizontal Adjust
qty10 Piher PT10LH2.5-47K Carbon Trimmer Potentiometer 10mm Horizontal Adjust

$4.99

View Details
(25 pcs) PIHER PTC10MH2SP 10K 50% Potentiometer Poti Trimmer NEW SALE SPAIN $10
(25 pcs) PIHER PTC10MH2SP 10K 50% Potentiometer Poti Trimmer NEW SALE SPAIN $10

$10.00

View Details
( 20 PCS ) Piher Trim Pot 2K Ohm Through Hole
( 20 PCS ) Piher Trim Pot 2K Ohm Through Hole

$10.95

View Details
(5x) - Piher 270K Ohm - 1/2W - Carbon Film - Marshall - Amps - New Old Stock
(5x) - Piher 270K Ohm - 1/2W - Carbon Film - Marshall - Amps - New Old Stock

$4.95

View Details
1 X VINTAGE PIHER RESISTOR. 1/2W 100K 5% *1 PC* NEW ORIGINAL 1970 ́S + RC1148
1 X VINTAGE PIHER RESISTOR. 1/2W 100K 5% *1 PC* NEW ORIGINAL 1970 ́S + RC1148

$4.69

View Details
(25) PIHER PCB Trimmer Pot - 100K OHM Cermet Potentiometer, 10mm - PTC10LV100KA
(25) PIHER PCB Trimmer Pot - 100K OHM Cermet Potentiometer, 10mm - PTC10LV100KA

$7.42

View Details
12X - 1K OHM  10mm Through-Hole POTENTIOMETER - PIHER # PT10LV10-102A2020  #184M
12X - 1K OHM 10mm Through-Hole POTENTIOMETER - PIHER # PT10LV10-102A2020 #184M

$6.99

View Details
Trimmer potentiometer Trim Pot, 10K Ohms, Side Adjust, See Pics, Quantity Of 2
Trimmer potentiometer Trim Pot, 10K Ohms, Side Adjust, See Pics, Quantity Of 2

$2.89

View Details
Piher Slide Potentiometer Linear 500OHM 500R
Piher Slide Potentiometer Linear 500OHM 500R

$3.20

View Details